February 11 - February 24, 2013

Sprint Themes

The Product team pointed and prioritized the following themes and tasks for Sprint 99, comprising 38.5 points. The team pulled in an extra 11 points during the sprint and completed 35.5 of the 49.5 total points for this sprint

Proposed Themes:

  • CONNECT 4.0 close out
  • HIMSS '13 Preparation
  • CONNECT 4.1
    • CI and Build optimizations
    • Corelib optimization
    • Component technology upgrades