Jul 29th - Aug 12, 2013
Executive Summary
Overall Status
Info |
---|
Sprint status is Excellent. The team accomplished all of the thematic work defined for the sprint and the release. |
Burndown
Cumulative Flow
Sprint Themes
The Product team pointed and prioritized the following themes and tasks for Sprint 113 comprising 24.5 points.
Proposed Themes:
- Rerun all Release 4.2 Testing on new GA build (CONN-461,CONN-555,CONN-557)
- Release 4.2 Regression Testing - https://developer.connectopensource.org/x/mgBnC
- Release 4.2 Installation Testing -https://developer.connectopensource.org/x/mABnC
- Release 4.2 Interoperability Testing -https://developer.connectopensource.org/x/EYC6C
- The Release 4.2 Testing Wiki page: https://developer.connectopensource.org/x/HgBgC
- The Release 4.2 Testing Summary Wiki page: https://developer.connectopensource.org/x/nABnC
- The Release 4.2 Interoperability Testing/Plan page: https://developer.connectopensource.org/x/BQCYC
- Complete Release 4.2 documentation (CONN-503)
- Release 4.2 – Support for JAVA 1.6 (CONN-350)
- The JAVA 1.6 Support Design Approach: https://developer.connectopensource.org/x/CQArC
- Release 4.2 – Multiple specification version enhancement support (CONN- 15 & CONN-46)
- Enhancing multi-spec support (initiating) Design Approach: https://developer.connectopensource.org/x/GoA0C
- Enhancing multi-spec support (responding) Design Approach: https://developer.connectopensource.org/x/kYDvBw
- Release 4.2 – Support for JAVA 1.6 (CONN-350)
- Healtheway Participation Certification Support
- Table 1 - https://developer.connectopensource.org/x/JwA4C
- Table 2 - https://developer.connectopensource.org/x/IoA7C
- Certification - https://developer.connectopensource.org/x/ZIC6C
- Final release preparation tasks for Release 4.2 availability (CONN-463)
...
(https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140)
Related Files
- Sprint 113 review notes|^s113_review and s114_planning.ppt|||||||\ - Notes about the work completed in s113. (Also includes work planned for s114)
- Sprint 113 planning notes - Notes about the work planned in s113. (Also includes work completed in s112)
- JIRA. See Sprint 113
- Release 4.2 code tag