Apr 7 - Apr 21, 2014
Executive Summary
Overall Status
Sprint status is excellent. The Product team prioritized the following themes and tasks for Sprint 128 comprising 31 points. These themes included - addressing technical debt, community support post release and design discussion for new feature development - Direct, Admin GUI and Testing gaps. During the course of the sprint some support related tickets for VA, DoD and Triple-I install were moved out early due to additional time required for pre-requisites - infrastructure or related paper work. The team pulled in additional tickets totaling 36 points; additional tickets pulled in included code cleanup and regression suite cleanup. The team also started working on a ticket related to the Direct feature, but could not complete it. The team completed 31 points.
Burndown
Sprint Themes and related tickets for Sprint 128:
- Community Implementation support
- Responded to forum posts - http://www.connectopensource.org/developer-resources/forums
- 4.4 Release
- New Features for next release
- Direct enhancements discussion and planning(CONN-951)
- The team discussed Direct feature and approach for implementation, documented notes and created functional and technical stories-
- Discussed new implementation guide for edge protocols - https://connectopensource.atlassian.net/wiki/x/BQDV
- Discussed goals - https://connectopensource.atlassian.net/wiki/x/oAGD
- Requirements draft is here - https://connectopensource.atlassian.net/wiki/x/lwGD
- Design approach draft - https://connectopensource.atlassian.net/wiki/x/KwGD
- Epic for these enhancements - CONN-381, that includes all the technical and user stories.
- Design will be updated iteratively as user stories are completed
- Administrative GUI discussion and planning (CONN-938)
- The team discussed Admin GUI feature, documented notes and created functional and technical stories.
- Epic for these enhancements - CONN-48, that includes all the technical and user stories.
- Discussed gaps in test coverage and came up with a list of tasks(CONN-993)
- The tickets created per this discussion are in the CONN-1008 epic.
- Direct enhancements discussion and planning(CONN-951)
- Bug fixes and other improvements this sprint
- Investigate how to create secured Mock NwHIN services (CONN-978) -/wiki/spaces/CONNECTWIKI/pages/13467724
- Remove HIEM interfaces from regression suites (CONN-953)
- Remove HIEM related properties from various soapUI Property files. (CONN-995)
- Regression test update - RequestResponseContentTypeTest - Document Retrieve - Description update(CONN-948)
- Investigated and tested large payload for Administrative Distribution and it was working as expected, no code changes were needed. (CONN-931)
- Made updates to the wiki page - /wiki/spaces/CONNECT4/pages/10584090
- Investigated and tested Event logging in the context of Patient Discovery Deferred response logging extra events, no code changes were needed(CONN-331)
- Corrected setup and tear down scripts for regression suites(CONN-951)
- Fix PatientDiscoveryInternalErrorMessageIdTest deferred response test case .(CONN-529)
- After executing the Passthru Test cases using JMX code, some of the transactionIDTest test cases are failing.(CONN-1000)
- Researched and analyzed 4.2 installation on WebLogic 12c(12.1.2) (CONN-895)
- New Features for next release
- Ongoing Custodial Agent Duties
- CONNECT 4 Blogs and Forum posts