Executive Summary

Overall Status

Sprint status is good. The team accomplished all of the thematic work defined for the sprint.

Sprint Themes

The Product team pointed and prioritized the following themes and tasks for Sprint 111 comprising 11 points.

Burndown

Cumulative Flow

Proposed Themes:

  • Finalize Release 4.2 testing plan and complete infrastructure set up
  • Begin Release 4.2 Testing 
    • Installation testing 
    • Validation testing 
    • Interoperability testing •
  • Continue working with Healtheway certification test cases (Table 2) 
    • Any issues found will be addressed on a case by case basis 
  • Continue working on CI tickets or work on Adapter tickets (CONN-424/ 425) needed for certification testing

Prioritized JIRA Planning Board of Committed User Stories for Sprint 111

(https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140)