Sprint 112 Progress Summary
Sprint 112 Progress Summary
Sprint Review + Planning | Jul 15th | 10am - 12pm ET
Registration for webinar: Click link below to register, and receive dial-in and Web participation details:
https://attendee.gotowebinar.com/register/7556627107749161728
Jul 15th - Jul 29th, 2013
Executive Summary
Overall Status
Sprint status is excellent. The team accomplished most of the thematic work defined for the sprint.
Sprint Themes
The Product team pointed and prioritized the following themes and tasks for Sprint 112 comprising 26 points. Points completed were 25.5.
Initial points committed – 21
1 ticket was moved to sprint 113 for 1.0
8 tickets pulled into sprint for 6.0
Burndown
Cumulative Flow
Sprint Themes:
- Complete Release 4.2 Testing
- Installation testing
- Set up and (Source)Install test CONNECT 4.2 on WebSphere Enterprise 7(Windows) (CONN-493)
- Set up and (Source) Install test CONNECT 4.2 on WebLogic 11g(Linux) (CONN-498)
- Set up and (Binary)Install test CONNECT 4.2 on JBoss(Linux) (CONN-499)
- Set up and (Source)Install test CONNECT 4.2 on JBoss(Linux) (CONN-500)
- Set up and (Binary)Install test CONNECT 4.2 on WebSphere Enterprise 8.5(Solaris) (CONN-501)
- The Release 4.2 Installation Testing: https://developer.connectopensource.org/x/mABnC
- Regression testing
- Review and update Regression Suite for all services (CONN-517, 518, 519 & 520)
- Review and update Regression Suite for adapter and common regression test (CONN-521)
- Complete regression testing (CONN-514)
- Complete regression testing for Large Payloads (CONN-523)
- Complete regression testing for Direct (CONN-522)
- The Release 4.2 Testing Wiki page: https://developer.connectopensource.org/display/CONNECT4/4.2+Release+Testing
- Interoperability testing
- Release 4.2 interoperability setup and test dry run (CONN-481)
- The Release 4.2 Interoperability Testing page: https://developer.connectopensource.org/x/BQCYC
- Installation testing
- Continue working with Healtheway/ CCHIT on certification program readinesshttps://developer.connectopensource.org/display/CONNECTWIKI/Table+2+-+Test+Cases+%28subset%29
- Completed Healtheway Pilot testing
- Reran updated Pilot test cases
- Ran draft certification test cases
- Started testing with the certification test cases release during Sprint 112
- Began addressing items identified during testing of latest version of certification test cases
- Security test set (CONN-537, 539, 540, 541, 542 & 543)
- Status on test cases
- Table 1 – https://developer.connectopensource.org/x/JwA4C
- Table 2 – https://developer.connectopensource.org/x/IoA7C
- Certification - https://developer.connectopensource.org/x/ZIC6C
- Continue to update Release 4.2 Documentation
- Release Notes
- Test Plan
- Installation, Regression, Interoperability Testing
- Software Documentation
- Architecture Document, System Implementation, Interface Description, Source Code Information
- Begin release preparation tasks for Release 4.2 availability
- Ensuring Release 4.2 Passes the latest release Healtheway Certification test cases
- Addressed Apache library warning notification
- Schedule new 4.2 Release date August 12th (end Sprint 113) - https://developer.connectopensource.org/x/AoBWC
Prioritized JIRA Planning Board of Committed User Stories for Sprint 112
(https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140)
Related Files
- Sprint 112 review notes - Notes about the work planned in s113. (Also includes work completed for s112)
- Sprint 112 planning notes - Notes about the work planned in s112. (Also includes work completed for s111)
- Sprint 112 code tag
- JIRA. See Sprint 112